Result 1
| SYSTEM REQUIREMENTS REVIEW – 2017
The first milestone was aimed at a deep analysis of the Landing Gear Requirements Matrix together with the Leader, in order to identify the compliance and the means to achieve it. |
Result 2 | PRELIMINARY DESIGN REVIEW - 2018
The preliminary design review delivered a preliminary design of the landing gear system in accordance with the Technical Specifications for significant parts. |
Result 3 | CRITICAL DESIGN REVIEW – 2019
The Critical Design Review delivered a detailed DMU (up to provisions) that was the result of negotiation on all the functional and technical requirements. With CDR achievement, the manufacturing phase has been launched. |
Result 4
| TRAP DOORS CDR – 2019
Detailed 3D models of both trap doors for Main Landing Gears and Nose Landing Gear were delivered, along with the results of the stress analysis. |
Result 5
| TEST RIG READINESS REVIEW – 2020
Accomplishment of Test Rig Readiness Review for the first phase of RACER Landing Gear System Qualification Review (QR'). Review has encompassed test rigs for Limit Drop Test, Static and Fatigue Drop Tests. |
Result 6
| ELECTRO-MECHANICAL ACTUATOR CDR – 2020
Accomplishment of Critical Design Review for the electromechanical actuator and its control modules. With CDR achievement, the qualification phase has started. |
Result 7 | DROP TEST READINESS REVIEW - 2020
MLG Drop Test Rig mounted in the Drop tower has been showed, along with the progress status of test article availability. |
Result 8 | SMART LANDING GEAR SYSTEM PDR – 2021
To PDR accomplishment, a preliminary design of SLG for hard landing detection was presented, that was developed according to system specifications and based on the results of a preliminary drop test campaign on a representative demonstrator. |